Jinnah Hospital Revamping
- 1B + G + 4 Stories
- Built-up Area = 700,000 sq. ft.
Services: Assessment of Structural Integrity of in-use Hospital Building comprising of nine (9) blocks including Damage Surveying, Core Sampling, Steel Extraction, Slab Load Tests, Evaluation of Test Data, Detailed Design of Rehabilitation, and Repair Methodology
Client: Infrastructure Development Authority Punjab (IDAP) / DAR Engineering