The Bridge is located in a seismically active area (Zone 4) close to an active fault. Multi-mode response spectrum analysis was carried out to assess the Response of the Bridge to Seismic Excitation. This was a pre-stressed concrete Box Girder Bridge with a total span of 210 meters.

Client: China Xinjiang Beixin Construction & Engineering (Group) Co., Ltd.